2001 — Pumori-Energy Ltd established. The company started work with only 2 machining centres: Okuma, and C. B. Ferrari.
2002 — First set of working blades of the 20th stage for the Ò 100 130 turbine (UTMZ) manufactured.
2004–2009 — Contract signed with Turboden from Italy and blading delivered in the course of 5 years for bio-fuel steam turbines.
2007 — Long-term cooperation agreement signed with Power Machines.
2007–2012 — Blading for various turbines manufactured and delivered to Power Machines, incl. blading for turbines of 1 mln kW for nuclear power plants.
2008–2009 — Blades and vanes manufactured and delivered for 5 turbines of 220 MW made by Power Machines for India.
2012 — Contract signed with Gazturboservis, a Gazprom company, for delivery of various types of blades and vanes for gas turbines.
2014 — Launched manufacture of gas turbine blades of alloys with 65% and 77% of nickel.
2014 — Contract signed with China and blading delivered for a turbine of 800 000 kW.
2014–2019 — Blading manufactured for gas turbines operated in the plants of EuroChem, Uralchem a. o. companies.
2014–2020 — Contract signed with The Ural Turbine Works for a number of years when blading for turbines of 30 to 300 MW produced by the Works are manufactured and shipped.
2015 — Contract signed with Dalenergomash under which blading for gas turbines are manufactured and shipped.
2015–2016 — Contract signed for manufacture and delivery of blading for MAN gas turbines working on gas pipelines in Turkmenistan (import substitution).
2016 — Contract signed with Belarus; various types of blades and vanes for steam turbines were manufactured and delivered.
2016 — Contract signed with Kazakhstan for delivery of blading for turbines of 100 000 kW.
2017–2018. — Blades manufactured for 25 stages of a turbine of 100 000 kW operated in Cuba.
2017–2019 — Participation in international power industry exhibitions in Cologne, Vienna, Paris.
2017–2020 — Contracts signed with REP Holding JSC for manufacture of blading for GE turbines purchased under licence (import substitution).
2018 — Contract signed with a UK company; blades for a turbine of 100 000 kW manufactured and delivered to Bosnia and Herzegovina.
2018 — Commercial operation of the Dispatcher shopfloor data collection system started.
2019–2020 — The quality management system recertified to the new version of ISO 9001:2015.
2019 — Assemblies of working blades of the control stage of the PT 135 130 turbine manufactured of rolled stock without the traditional process of making assemblies by welding two blades together.